The Tribal Welfare Engineering Department is entrusted with the task of providing safe drinking water to all the tribal habitations, all weather road connections to all the habitations and buildings to run educational institutions in the tribal villages. |
| |
| A. Drinking water Supply Programme: |
| |
It is proposed to cover 139 not covered (NC) habitations and 1253 partially covered (PC) habitations totalling to 1392 habitations at an estimated cost of Rs. 2784.00 lakhs subject to release of funds as the budget control is vested with the P.R Engineering Department. |
| |
| B. Minor Irrigation: |
| |
A master plan is prepared in the year 1997 for providing M.I facilities in Tribal Welfare Sub Plan areas, which envisages development of an ayacut of 28022.12 acres and 13091 tribal beneficiaries are expected to be benefited through 633 M.I schemes at an estimated cost of Rs. 1758.55 lakhs.
It is proposed to cover entire Tribal sub plan with M.I. facilities over a span of 6 years subject to release of funds through the Special M.I. Divisions under the control of Chief Engineer (M.I). The budget control is vested with Irrigation & CAD department. |
| |
| C.Roads: |
| |
The road net work in Tribal Areas depend on special funds, as there is not Tribal budget on this item. Any how the Master plan envisages lying approach roads for a length of 30487.04 Kms at an estimated cost of Rs. 91461.10 lakhs, benefiting 2586549 population and connecting 3254 habitations. It is proposed to cover entire Tribal Sub-plan (TSP) with road net work over a span of 10 years from the funds of G.O. A.P. like Chaitanyam and funds from G.O.I. |
| |
| D. Buildings: |
| |
The road net work in Tribal Areas depend on special funds, as there is not Tribal budget on this item. Any how the Master plan envisages lying approach roads for a length of 30487.04 Kms at an estimated cost of Rs. 91461.10 lakhs, benefiting 2586549 population and connecting 3254 habitations. It is proposed to cover entire Tribal Sub-plan (TSP) with road net work over a span of 10 years from the funds of G.O. A.P. like Chaitanyam and funds from G.O.I. |
| |
| |
|
| 1. |
Boys Hostels
There are 451 Ashram Schools functioning in the state. Government buildings for 406 Ashram Schools were constructed to accommodate 40,600 students and ten (10) are in progress. Government buildings for the remaining 35 Ashram Schools with an estimated cost of Rs. 2625 lakhs are proposed to be constructed in a phased manner as per the availability of funds. |
| |
|
| 2. |
Girls Hostels:
There are 392 Boys Hostels functioning in the State. Government buildings for 256 Boys Hostels were constructed and 15 are in progress. The 256 Boys Hostels provides accommodation to 25,600 Boys.
Government buildings for the remaining 121 Boys Hostels with an estimated cost of Rs. 2964 lakhs will be constructed in a phased manner as per availability funds. |
| |
|
| 3. |
Girls Hostels:
There are 124 Girls Hostels functioning in the State. Out of 122 Girls Hostels taken upfor constructions, 102 hostels are completed, 6 hostels are in progress and an amount of Rs. 484.00 lakhs is required completion of the remaining works. |
| |
|
| 4. |
Residential Schools
There are 50 Residential Schools functioning in the State. Construction of the buildings were sanctioned for 43.33 buildings are completed. 10 School buildings are in progress and remaining are yet to be sanctioned by Government. An amount of Rs. 3220 lakhs is required for construction of the remaining 7 Residential School Buildings. This will be completed in a phased manner depending on the availability of funds. |
| |
|
| 5. |
Computerization:
The Chief Engineer’s Superintending Engineer’s Office are only having basic minimum Computer facilities. In a phased manner it is proposed to computerise the Executive Engineers and Dy. Executive Engineers Offices depending on the availability of funds. |
|