QUALITY CONTROL & VIGILANCE DIVISION
TRIBAL WELFARE ENGINEERING DEPARTMENT
HYDERABAD |
| |
| QUALITY CONTROL TESTS AS PRESCRIBED IN CODES |
| |
| A) |
QC TESTS INSISTED TO BE GOT CONDUCTED AT " LOCAL ENGINEERING COLLEGE LABORATORIES " |
|
| |
| Item |
Parameters for
which test conducted |
| A. Roads |
1) Earthwork |
Gradation |
| |
|
Plasticity Index |
| |
|
Proctor's Density Test |
| |
|
Moisture Content |
| |
|
California Bearing Ratio |
| |
2) Sub Base -Gravel |
Gradation |
| |
|
Plasticity Index |
| |
3) Sub Base / WBM |
Aggregate Impact Value |
| |
|
Water absorption Test |
| |
|
Gradation |
| |
|
Flakiness Index |
| |
4) Bitumen |
Penetration Value |
| |
|
Viscosity |
| |
|
Fire & Flash Points |
B. Buildings,
Cross Drainage
Works & other
works |
1) Bricks |
Crushing strength |
| |
|
Water absorption Test |
| |
2) Cement |
Compressive strength |
| |
|
Setting Times |
| |
|
Consistency |
| |
3) Steel |
Tensile strength |
| |
|
Brittleness |
| |
4) Compressive
Strength of RCC |
Compressive strength |
| |
5) Coarse Aggregate
Metal (20mm & 40mm Size) |
Gradation |
| |
|
Crushing strength |
| |
|
Water absorption |
|
| |
| B) |
QUALITY CONTROL TESTS BEING CONDUCTED BY THE QC DIVISION AT SITE AND ALSO INSISTED FOR GETTING DONE BY THE RESPECTIVE FIELD STAFF |
|
| |
| Item |
Parameters for
which test conducted |
| A. Roads |
1) Earthwork |
Gradation |
|
|
Plasticity Index |
|
|
Proctor's Density Test |
|
|
Moisture Content |
|
|
California Bearing
Ratio |
|
2) Sub Base -Gravel |
Gradation |
|
3) Sub Base / WBM |
Gradation |
|
|
Bulk Density |
|
4) Bitumen &
BT Surface dressing |
Temperature control
of binder and
aggregate in drier |
|
|
Thickness & density
of compacted layers |
|
|
Rate of spread
of binder |
|
|
Rate of spread
of aggregate |
B.Buildings,
Cross Drainage
Works & other works |
1) Bricks |
Soundness |
|
|
Water absorption
Test |
|
2) Cement |
Setting Times |
|
|
Consistency |
|
3) Steel |
Density |
|
|
Diameter |
|
4) Compressive
strength of RCC |
Compressive
strength |
|
| |
| VIGILANCE CASES |
| |
| » |
The records relating to the points figured in a particular complaint being verified and records are seized in the event of necessity |
| » |
The factual detailed verification report with reference to the compliant is being prepared and submitted to the Chief Engineer / Authority concerned |
|
| |