RATES FOR CONVEYANCE OF METAL, STONE, RUBBLE INCLUDING CUDDAPAH SLABS INCLUIDNG LOADING, UNLOADING &STACKING ON METALLED ROAD FOR                               2003 - 2004              
S.No. LEAD UNIT S S Rate      for        2003-04
1 2 3 4
1 UP TO  500   mts.   cum 78.50
2  1 Km.   cum 81.70
3  2 Km.   cum 83.80
4  3 Km.   cum 88.00
5  4 Km.   cum 91.50
6  5 Km.   cum 94.70
7  6 Km.   cum 100.10
8  7 Km.   cum 102.40
9  8 Km.   cum 104.50
10  9 Km.   cum 109.90
11  10 Km.   cum 112.20
12  11 Km.   cum 116.10
13  12 Km.   cum 120.80
14  13 Km.   cum 124.10
15  14 Km.   cum 128.30
16  15 Km.   cum 130.60
17  16 Km.   cum 133.90
18  17 Km.   cum 138.10
19  18 Km.   cum 141.50
20  19 Km.   cum 143.70
21  20 Km.   cum 149.00
22 Beyond 20 and up to 30 Km (Rate/Km)   cum 3.70
23 Beyond 20 and up to 50 Km (Rate/Km)   cum 3.40
24 Beyond 50 and up to 80 Km (Rate/Km)   cum 3.00
25 Beyond 80 and up to 100 Km (Rate/Km)   cum 2.90
26 Beyond 100 Km (Rate / Km)   cum 2.70
27  L O A D I N G   cum 8.60
28 U N L O A D I N G   cum 5.90
29 S T A C K I N G   cum 5.90