| RATES FOR CONVEYANCE OF METAL, STONE, RUBBLE INCLUDING CUDDAPAH SLABS INCLUIDNG LOADING, UNLOADING &STACKING ON METALLED ROAD FOR 2003 - 2004 | |||
| S.No. | LEAD | UNIT | S S Rate for 2003-04 |
| 1 | 2 | 3 | 4 |
| 1 | UP TO 500 mts. | cum | 78.50 |
| 2 | 1 Km. | cum | 81.70 |
| 3 | 2 Km. | cum | 83.80 |
| 4 | 3 Km. | cum | 88.00 |
| 5 | 4 Km. | cum | 91.50 |
| 6 | 5 Km. | cum | 94.70 |
| 7 | 6 Km. | cum | 100.10 |
| 8 | 7 Km. | cum | 102.40 |
| 9 | 8 Km. | cum | 104.50 |
| 10 | 9 Km. | cum | 109.90 |
| 11 | 10 Km. | cum | 112.20 |
| 12 | 11 Km. | cum | 116.10 |
| 13 | 12 Km. | cum | 120.80 |
| 14 | 13 Km. | cum | 124.10 |
| 15 | 14 Km. | cum | 128.30 |
| 16 | 15 Km. | cum | 130.60 |
| 17 | 16 Km. | cum | 133.90 |
| 18 | 17 Km. | cum | 138.10 |
| 19 | 18 Km. | cum | 141.50 |
| 20 | 19 Km. | cum | 143.70 |
| 21 | 20 Km. | cum | 149.00 |
| 22 | Beyond 20 and up to 30 Km (Rate/Km) | cum | 3.70 |
| 23 | Beyond 20 and up to 50 Km (Rate/Km) | cum | 3.40 |
| 24 | Beyond 50 and up to 80 Km (Rate/Km) | cum | 3.00 |
| 25 | Beyond 80 and up to 100 Km (Rate/Km) | cum | 2.90 |
| 26 | Beyond 100 Km (Rate / Km) | cum | 2.70 |
| 27 | L O A D I N G | cum | 8.60 |
| 28 | U N L O A D I N G | cum | 5.90 |
| 29 | S T A C K I N G | cum | 5.90 |