RATES FOR CONVEYANCE OF LIME STONE, BROKEN LATERITE AND BRICK JELLY  INCLUDING LOADING, UNLOADING &STACKING ON METALLED ROAD FOR                           2003 - 2004              
S.No. LEAD UNIT S S rate            for        2003-2004
1 2 3 4
1  0   To 250   mts.   cum 75.30
2 251 To 500   mts.   cum 75.90
3  1 Km.   cum 78.40
4  2 Km.   cum 80.30
5  3 Km.   cum 84.40
6  4 Km.   cum 87.90
7  5 Km.   cum 91.40
8  6 Km.   cum 94.20
9  7 Km.   cum 97.70
10  8 Km.   cum 101.20
11  9 Km.   cum 104.50
12  10 Km.   cum 106.40
13  11 Km.   cum 110.90
14  12 Km.   cum 113.40
15  13 Km.   cum 118.00
16  14 Km.   cum 120.80
17  15 Km.   cum 123.70
18  16 Km.   cum 126.70
19  17 Km.   cum 129.90
20  18 Km.   cum 133.60
21  19 Km.   cum 137.30
22  20 Km.   cum 139.60
23 Beyond 20 and up to 30 Km (Rate/Km)   cum 3.50
24 Beyond 20 and up to 50 Km (Rate/Km)   cum 3.30
25 Beyond 50 and up to 80 Km (Rate/Km)   cum 2.70
26 Beyond 80 and up to 100 Km (Rate/Km)   cum 2.60
27 Beyond 100 Km (Rate / Km)   cum 2.30
28  L O A D I N G   cum 6.90
29 U N L O A D I N G   cum 5.40
30 S T A C K I N G   cum 3.80