CHAPTER – VI
 
LAND DEVELOPMENT
 
1. LAND DEVELOPMENT
 
Item
of Inves-tment
Unit
Cost
(Rs.)
Repay-ment period Gestation
/Grace
period
Instal-lment period
1. ICRISATTechnology Black Soil 1700 7 Years 2 Years Annual
2. ICARTechnology 1400 7 Years 2 Years Annual
  Black Soil Red Soil 1600 7 Years 2 Years Annual
3. In-situ MoistureRetention Technology 1100+900 7 Years Nil Annual
4. Bunding        
i) Contour bunding        
  Graded bunding        
  0% to 2 % 200 5 Years 1 Year Annual
  2% to 3 % 240 5 Years 1 Year Annual
  3% to 6% 310 5 Years 1 Year Annual
  6% to 10% 350 5 Years 1 Year Annual
ii) Grass Sodding on bunds 120/100m 5 Years 1 Year Annual
iii) Bund Planting 300/100m 5 Years 1 Year Annual
iv) Stone weirs/Outlets on BundsFor 3 structuresPer acre @ Rs.180 540 5 Years 1 Year Annual
5. Bench Terracing        
  5-10% 5450 7 Years 1 Year Annual
  10-20% 7550 7 Years 1 Year Annual
  20-33% 10000 7 Years 1 Year Annual
6. Zingg Terraces        
  3-5% 1250 7 Years 1 Year Annual

 

5-10%

1830

7 Years

1 Year

Annual

7.

Gullyplugging with pipe

 

 

 

 

i)

Shallow

1760

5 Years

1 Year

Annual

ii)

Medium

3680

5 Years

1 Year

Annual

 
2. EARM IMPLEMENTS
 
Item
of Inves
tment
Unit
Cost (Rs.)
Re
pay
ment period
Gestation/
Grace
period
Install
ment period

1.

For land preparation (M.B.plough, Fespo plough, bund formers etc.)

600-1000

5 Years

1 Year

Annual

2.

Seed-cum-Ferti drill

 

 

 

 

i)

Eenati gorru

820-1150

5 Years

1 Year

Annual

ii)

Rayalagorru

1390

5 Years

1 Year

Annual

iii)

Tropicultor with attachments

33520

7-9 Years

1 Year

Annual

iv)

Agribar with Attachments

18240

7-9 Years

1 Year

Annual

v)

T-bar with accessories

8755

7-9 Years

1 Year

Annual

3.

Powr operated

 

 

 

 

i)

Implements Groudnut Digger (ashaguntaka)

14400

7 Years

1 Year

Annual

ii)

Groundnut Decirtucator (1.5 to @2.0 hp power Operated)

11325

7 Years

1 Year

Annual

iii)

Groundnut Stripper

10300

7 Years

1 Year

Annual

iv)

Mini dehuller without Motor

9900

7 Years

1 Year

Annual

v)

Mini dehullar with 3 hp electric motor

16720

7 Years

1 Year

Annual

4.

Threshers/Reapers

 

 

 

 

i)

Multicrop Thresher APAU Model without Prime Mover

30415

7-9 Years

1 Year

Annual

ii)

Multicrop Thresher with electric motor (7.5 hp)

41965

7-9 Years

1 Year

Annual

iii)

Multicrop Thresher with 8/10hp air cooled engine

44915

7-9 Years

1 Year

Annual

 
3. Fencing.
 
S.No. Item of investment Unit Cost (Rs.) Repayment Period Gestation/ Grace Period Installment Period

i)

Ordinary

1000-1500

5

1

Half-yearly

ii)

Live fencing for Horticulture

500

Same as the Horticulture Crop

 

 

iii)

Bunding

360-900

5

1

Half-Yearly

5.

Reclamation of saline / alkalic soil:

 

2600

7-9

1

Annual

6.

Compost making by NADEP process

4400

5

1

Annual

 
SPECIAL TERMS AND CONDITIONS – LAND DEVELOPMENT ACTIVITIES
 
(LEVELING , BUILDING AND SHAPING)
 
1.
The average unit cost of land development is arrived at by taking into  consideration the earth work involved in land development under different slope group. Therefore, it is essential to know the corresponding area for each slope group of the total area to be developed. The total cost of the land development works can be then arrived by aggregating slope – group – wise cost of land development for the out-let command and adding cost of other essential structures such as distribution boxes, drop pits, lining, outlets, stone-pitching etc., As the work has to carried out as a complete package, the cost of construction of water course and filed drainage, wherever included, is considered as community item and apportioned against cultivators equality, whereas, land development  being individual item, the cost is assessed on the basis of the area coming under the preparation of plans and estimates by the concerned technical staff of the agriculture / soil conservation / command Area Development Departments etc., In case of land development works in individual holdings of non CADA area, such as well commands, LI commands , the banks may obtain estimates from some qualified Agriculture Engineers / soil conservation Officers.
2.
Land leveling, shaping, bunding construction of water courses and drains etc., shall be done as a package in compact blocks, wherever possible.
3.
Necessary technical guidance and supervision may be provided by bank’s staff. Alternatively the bank shall satisfy itself that the required technical guidance and supervision is made available by the concerned department of the State Government.
4.
The bank may satisfy itself that the State Government takes the following action under the scheme.
5.
In case of shallow soil conditions, the width of the plots/strips should be reduced in order to avoid deep cutting and exposure of sub-soil. In cases where deep cutting upto sub-soil is unavoidable, other development measures like addition of silt may be ensured to restore soil productivity.
6.
Adequate arrangements for drainage of excess water is to be ensured to prevent water logging conditions with associated ill effects.
7.
Farm irrigation structures may be constructed appropriately to prevent soil erosion along  irrigation channels within the holding.
8.
While irrigation soil conservation in the existing gardens/plantations, care must be taken by selecting such structures and designs which cause the least disturbance to the root system of existing crops.
9.
In case of supplementary scheme/additional scheme the proposal should contain a report on the performance of the sanctioned original / on-going scheme.
 
Repayment period At the end of 4th  year of felling of the Plantations, whichever is earlier.
 
 
About Tricor  «
Action Plans  «
NSTFDC  «
Unit Profiles  «
Project Profiles  «
Success Stories  «
Photo Gallery  «
Right to Information Act  «
Downloads  «
Note from CEO,
Dept of PR & RD
 «
Evaluation Studies  «
GO's  «
Citizen Charter  «
Schemes «
Related Links «
 
Commissionerate | TCR & TI | TRICOR | Chief Engineer TWD | APTWREIS (Gurukulam) |
| TRIPCO | TRIMCO | ITDAS | MADA | DTWOs
All Right Reserved. www.aptribes.gov.in | 2006-2007 Privacy Policy