| District |
Name of the ITDA |
Location |
Estimated capacity(in MW) |
Total |
| Khammam |
Bhadrachalam |
Fall of the canal at fore by reservoir (on the pick up down to forbay reservoir canal) Chintur (M), Khammam district. |
1.10 |
1 |
| |
|
Left bank of river Godavari near Dummugudem |
1.00 |
1 |
| |
|
Left Bank of Sileru River at certificate of Lower Sileru Hydel Power Project Tall Race Channel & Sileru river to D/s at 1 KM to 2.50 KM near Piluru (M), Chintoor (M), Khammam |
2.00 |
1 |
| |
|
MHES at 5 KM down stream of lower Sileru Tail Raco Channel of LSPH. |
3.00 |
1 |
| |
|
MHES of 20MW capacity utilizing the tailrace water of LSHES of AP Genco (4x115MW) |
20.00 |
1 |
| |
|
MHES on Tadikavagu falls at Thenemadugu |
1 |
1 |
| |
|
MHS at M9/4 of power canal joining into forbay reservoir of lower Sileru project at Methugudem (V) |
2.00 |
1 |
| |
|
MHS on Godavari river at Dummugudem village has about 3.6mt. drop and rated flow of 90cumecs |
3.00 |
1 |
| |
|
MHS utilizing tailrace water of lower sileru power house run by APSEB. The water is proposed to be used at Peddavagu after construction of 6kms power channel where off take regulator in before |
10.00 |
1 |
| |
|
On Sileru river Nelakota (V), Chintoor (M) |
1.00 |
1 |
| |
|
Right bank of river Godavari near Dummugudem |
1.00 |
1 |
| |
|
There is 15 mtrs. Water fall and about 5mtrs fall in the bed slope of Gummadidoddivagu near Gummadidoddi (V) |
2.00 |
1 |
| |
|
There is steep bed fall in Sukaleru near tulasiyakuler (V), Chintur (M) |
1.00 |
1 |
| Khammam Total |
13 |